Battery Charge Time Calculator

Estimate how long it takes to charge a battery bank from a charger, DC-DC charger, alternator or solar. Enter the capacity, the starting and target state of charge, and the charging current.

The charger's output current, or the average current from solar or an alternator.

4.2 hoursEstimated charge time

Amp hours to replace
160 Ah
Charge rate
0.2C
With twice the charging current
2.1 hours
With half the charging current
8.4 hours

Assumes the charger delivers its full current for the whole charge, with 95% charge efficiency for lithium and 80% for lead-acid. Never exceed the maximum charge current in the battery manufacturer's specification.

How charge time is calculated

Charge time is the amp hours to be replaced divided by the charging current, with an allowance for charge efficiency. Taking a 200 Ah lithium battery from 20% to 100% means replacing 160 Ah; at 40 A that takes about 4.2 hours.

Lithium batteries accept close to full current until they are nearly full, so the estimate is realistic for them. Lead-acid and AGM batteries slow down sharply above about 80% state of charge, in what is called the absorption stage, so the last 20% takes much longer than the simple calculation suggests.

The charge rate, or C-rate, is the charging current divided by the capacity. 40 A into 200 Ah is 0.2C. Many lithium batteries recommend 0.2C to 0.5C; check the specification for yours.

Lithium battery charge time chart

Hours to charge a lithium battery from empty to full.

Capacity20 A charger30 A charger50 A charger100 A charger
100 Ah5.33.52.11.1
200 Ah10.574.22.1
300 Ah15.810.56.33.2
400 Ah21.1148.44.2
600 Ah31.621.112.66.3

Battery charging questions

How long does it take to charge a 100Ah lithium battery?

From empty, about 5.3 hours with a 20 A charger, 3.5 hours at 30 A and 2.1 hours at 50 A.

How long does it take to charge a 200Ah battery with a 40 amp charger?

A lithium battery going from 20% to 100% needs 160 Ah replaced, which takes about 4.2 hours at 40 A.

What size charger do I need?

A common target is a charge rate of 0.2C to 0.5C: 40 A to 100 A for a 200 Ah lithium bank. Stay within the battery manufacturer's maximum charge current.

Why does my lead-acid battery take longer than the estimate?

Lead-acid batteries accept less and less current above about 80% state of charge. That absorption stage can add several hours regardless of charger size.